Gern & Cie Sa
Transformation of the ground floor of the factory, 2022 Bevaix (NE)
The reorganization and expansion of the 2nd production area in our company had become a necessity. This work was vital so that we could continue to serve our customers by installing a new offset printing machine. Bat-Mann Constructeur Intégral SA seduced us by a simple, economical and well structured project study.
At the end of the project which took place over a period of 2 months, the time and cost constraints were fully respected. Adaptation work such as carpentry, compressed air, ventilation, or electricity was also necessary for the smooth operation of the new production area. Here too, these measures were followed irreproachably. Gern Etiquette welcomes the excellent relationship with Bat-mann and thanks it for its collaboration
- 300 m2
- 900 m3
- 3 month
- 2013