Servion
Realization of a production building, 1077 Servion (VD)
Implementation:
- Production plant for watches winders
- 4 offices, a conference room
- 3 production areas
- 1 room in stock
- a reception
- a cafeteria and changing rooms
Type of construction:
- Reinforced concrete structure and facades metal crossbeams
Technical features:
- Air / water heat pump
- 740 m2
- 3'530 m3
- 11 month
- 2017